To the central content area

The project of soi and groundwater pollution prevention, Investigation, supervising, and verification in 2009

Absrtact
The proceedings of the project including tasks of supervision, verification, regular monitoring, database establishment, document examination and public symposiums, etc. Furthermore to maintain and manager wells in Tainan County, it is also including the tasks to check well conditions, integrate regional and specific wells coding and make the well cards thoroughly total to 206 wells. Before the end of this project, 4 Mar, 2010, each has successfully completed or exceeded the requirements of the work. On site supervision and verification, EPB (Environmental Protection Bureau) would list six sites verified whose analysis results are greater than the soil and groundwater control standards into the soil and groundwater pollution control site according to Soil and Groundwater Pollution Remediation Act. Regular groundwater monitoring results are similar to the earlier analysis except As concentration in Hu-Tou-Pi site at the second season reached the second category groundwater pollution monitoring standards. And newly legal pollutant items which were inspected by sites are all under legal limits. The tasks about the official documents examination and database maintaining were both achieved over 100 percentage of scheduled progress. And two seminars which one is for gas station business and the other is on amendments of Soil and Groundwater Pollution Remediation Act have done. In addition, we executed one emergency measure drill along with Tainan County for general people to realize soil and groundwater pollution remediation.
Keyword
soil, groundwater, pollution, verification
Open
top